From component data to funding decisions
Watch the same reserve plan move through the platform — one connected flow, not five disconnected tools.
- Roofing — Bldg A2027
- Elevator modernization2028
- Exterior paint2029
- HVAC — rooftop units2030
- Fire systems2030
- Asphalt resurfacing2032
Component inventory
Every roof, elevator, paved surface, and mechanical system is captured in one structured library — categorized, dated, and searchable.
Cost forecasting
Apply inflation and useful-life assumptions to turn today's cost into a defensible future replacement cost — for every component, every year.
30-year projections
See annual expenditures and your reserve balance over three decades, with the funding threshold drawn in — so shortfalls are obvious early.
Funding strategy
Model contributions against percent-funded and special-assessment risk. Adjust the plan and watch reserve health respond instantly.
Report builder
Compile everything into a board-ready report — executive summary, funding plan, and full component schedule — exported or shared as a live link.